The Merlin Wind Turbine Installation System has been designed and patented by The Engineering Business Ltd (EB). This project, phase 1 of the development, comprises a feasibility study carried out by EB, and part funded by the DTI with the key objective of: Investigating the technical and economical viability of the Merlin system as an alternative technique for installing offshore wind turbines. Total project cost = 189545, DTI grant = 129597