Having demonstrated the fundamental proof of concept for the EB Frond Wave Energy Collector through the Phase one project, the next step (the Phase two project) was proposed to further assess the technical and commercial viability of the EB Frond concept through the development of the existing mathematical and physical modelling methods. Total Project cost = 328172, DTI grant = 246129
Abstract
EB Frond is a wave generator with a collector vane at the top of an arm pivoted near the seabed. The arm oscillates like an inverted pendulum, driven by the water particle motion in the waves. EB Frond incorporates devices which allow the pendulum motion to be tuned to the dominant frequency of the waves, and a set of hydraulic cylinders connected between the arm and the structure which deliver high-pressure oil to a hydraulic motor connected to an electrical generator. The structure is held r igidly on the seabed in a nearshore location and remains submerged at all times.