TOTEM (Transmission Owner Tools for EMT Modelling) Extension

Reference Number
NIA_SHET_0035
Title
TOTEM (Transmission Owner Tools for EMT Modelling) Extension
Status
Completed
Energy Categories
Other Cross-Cutting Technologies or Research(Energy Models)
Other Power and Storage Technologies(Electricity transmission and distribution)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
UKERC Cross Cutting Characterisation
Systems Analysis related to energy R&D (Energy modelling)
Principal Investigator
Project Contact
SSEN Scottish Hydro Electric Transmission
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 May 2022
End Date
31 March 2023
Duration
ENA months
Total Grant Value
£437,000
Industrial Sectors
Power
Region
Scotland
Programme
Network Innovation Allowance
Investigators
Principal Investigator
Project Contact, SSEN Scottish Hydro Electric Transmission
Other Investigator
Project Contact, National Grid Electricity Transmission
Project Contact, SPEN - SP Transmission Plc
Industrial Collaborator
Project Contact, Scottish and Southern Energy plc
Project Contact, National Grid plc
Project Contact, SP Energy Networks
Web Site
Objectives
Manitoba Hydro International (MHI) is a world leader in power system simulation and has developed a way to study electromagnetic transient (EMT) behaviour on large systems, like the full GB transmission system, using the PSCAD simulation software. This project proposes to have MHI develop and validate a full-scale model in PSCAD for the GB transmission system. The project scope will be to;• Develop new tools for automatic reduction of the PSCAD model to produce both static and dynamic equivalents of the reduced areas;• Develop new tools for configuration and quick initialisation of the EMT models to support future work by the Transmission Owners (TOs);• Perform illustrative studies based on the developed PSCAD network including;- sub-synchronous resonance investigations- control instability studies- switching studies on a selection of substations• Participate in a knowledge transfer workshop to provide the TOs and ESO with the capability to use the models, extend them as required in the future, and perform a range of studies. The objectives of the project are as follows:1. Validate a PSCAD model of the GB transmission network and from that derive separate models for each of the three TO licence areas;2. Deliver tools for PSCAD model manipulation and analysis that will support the TOs and the ESO in their use of the GB model;3. Provide the GB TOs and ESO with the knowledge and understanding required to adopt the models and put them into use; and4. Install shared computing resources for running the most complex models.
Abstract
Continuation of NIA_SHET_0032 TOTEM, to complete the development and associated validation of a full-scale model of the GB Transmission System in electromagnetic transient (EMT) PSCAD simulation software.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
14/10/22