go to top scroll for more

PERFORMANCE COMPARISON OF TRADITIONAL AND EMERGING DOUBLY-FED GENERATOR TOPOLOGIES FOR GRID-CONNECTED WIND POWER APPLICATIONS

Reference Number
EP/F06148X/1
Title
PERFORMANCE COMPARISON OF TRADITIONAL AND EMERGING DOUBLY-FED GENERATOR TOPOLOGIES FOR GRID-CONNECTED WIND POWER APPLICATIONS
Status
Completed
Energy Categories
Renewable Energy Sources(Wind Energy)
Other Power and Storage Technologies(Electric power conversion)
Research Types
Basic and strategic applied research
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Dr M Jovanovic
Sch of Engineering & Technology
Northumbria University
Award Type
Standard
Funding Source
EPSRC
Start Date
01 October 2008
End Date
30 September 2011
Duration
36 months
Total Grant Value
£132,897
Industrial Sectors
Energy
Region
North East
Programme
Energy : Energy
Investigators
Principal Investigator
Dr M Jovanovic, Sch of Engineering & Technology, Northumbria University
Industrial Collaborator
Project Contact, Scottish and Southern Energy plc
Web Site
Objectives
Linked to grant EP/F061714/1
Abstract
Currently the accepted technology for large wind turbines is the doubly-fed induction generator (DFIG). This technology is popular primarily due to the reduced cost of the partially rated power electronic converter. On the negative side is the fact that the generator requires brushes and slip rings which require regular maintainance.An alternative scheme is based on the brushless doubly-fed reluctance machine (BDFRM) which also has the cost benefit of a partially rated power converter but asits name implies does not require brushes and slip rings.The BDFRM has not been used for a wind power application. This project will experimentally examine its performance for a wind power application. There are a number of different approaches to the control of a BDFRM. The project will examine the use of Direct Power Control (DPC). This control approach will include sensorless operation and machine parameter independence.With the proliferation of wind power generation the issue of power system stabilty is of great concern. It is important to examine the fault-ride-through (FRT) capabilty of any generation system. This project will examine the FRT capability of the BDFRM and compare this tothat of the DFIG. This will require that special grid fault emulation equipment is included in the laboratory test rig
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
14/03/08