Projects: Projects for Investigator |
||
Reference Number | GR/S18915/01 | |
Title | A Generic Process for Assessing Climate Change Impacts on the Electricity Supply Industry and Utilities | |
Status | Completed | |
Energy Categories | Renewable Energy Sources(Wind Energy) 60%; Energy Efficiency(Residential and commercial) 20%; Other Power and Storage Technologies(Electric power conversion) 20%; |
|
Research Types | Basic and strategic applied research 100% | |
Science and Technology Fields | ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100% | |
UKERC Cross Cutting Characterisation | Not Cross-cutting 80%; Systems Analysis related to energy R&D 20%; |
|
Principal Investigator |
Prof S (Simon ) Watson No email address given Electronic and Electrical Engineering Loughborough University |
|
Award Type | Standard | |
Funding Source | EPSRC | |
Start Date | 01 August 2003 | |
End Date | 31 October 2006 | |
Duration | 39 months | |
Total Grant Value | £186,388 | |
Industrial Sectors | Energy; Technical Consultancy | |
Region | East Midlands | |
Programme | Process Environment and Sustainability | |
Investigators | Principal Investigator | Prof S (Simon ) Watson , Electronic and Electrical Engineering, Loughborough University (100.000%) |
Industrial Collaborator | Project Contact , Building Research Establishment (BRE) Ltd (0.000%) Project Contact , National Grid plc (0.000%) Project Contact , Oscar Fabers and Partners (0.000%) Project Contact , Renewable Energy Systems (0.000%) Project Contact , Garrad Hassan and Partners Ltd (0.000%) Project Contact , E.ON E&P UK Ltd (0.000%) |
|
Web Site | ||
Objectives | ||
Abstract | This project will develop a generic process for assessing the impact of the UKCIP02 climate change scenarios on the performance of the electricity supply industry (ESI), the latter being representative of similar complex utilities such as the gas, telecommunications and water supply industries. The generic assessment process will provide the currently missing integrating framework that is essential if the many technical and business risks that climate change may impose on the ESI are to be properly managed. The new assessment process will be developed and evaluated by conducting an analysis of the ESI system, from generation through to customer, with a focus on wind power generation as an example of an important renewable energy source that is particularly susceptible to climate variables. The study will concentrate on two exemplar aspects, namely the impact of electricity consumption patterns and the impact on wind power generation | |
Data | No related datasets |
|
Projects | No related projects |
|
Publications | No related publications |
|
Added to Database | 01/01/07 |