| Title | Natural Gas Fired Zero-emission Power Plant (GAS-ZEP) - Materials Work Package. | |
| Status | Completed | |
| Energy Categories | Other Power and Storage Technologies(Electric power conversion) 100%; | |
| Research Types | Basic and strategic applied research 100% | |
| Science and Technology Fields | PHYSICAL SCIENCES AND MATHEMATICS (Physics) 100% | |
| UKERC Cross Cutting Characterisation | Not Cross-cutting 100% | |
| Principal Investigator |
Mr JE Oakey School of Applied Sciences Cranfield University |
|
| Award Type | Standard | |
| Funding Source | EPSRC | |
| Start Date | 04 November 2002 | |
| End Date | 03 November 2005 | |
| Duration | 36 months | |
| Total Grant Value | £252,097 | |
| Industrial Sectors | Mechanical engineering | |
| Region | East of England | |
| Programme | Materials Foresight Link -- Materials, Mechanical and Medical Eng | |
| Investigators | Principal Investigator | Mr JE Oakey , School of Applied Sciences, Cranfield University |
| Industrial Collaborator | Project Contact , Cranfield University Project Contact , Babcock International Group plc Project Contact , Alstom Energy Technology Centre Project Contact , C J Day Associates Project Contact , University of Ulster Project Contact , RWE Innogy Project Contact , National Museums Liverpool Project Contact , New College Lanarkshire |
|
| Web Site | ||
| Objectives | ||
| Abstract | This EPSRC proposal forms part of a Foresight LINK proposal led by ALSTOM Power aimed at the conceptual design of a natural gas 'semi-closed CO2 cycle' unit (GAS-ZEP). This concept offers 100% removal of CO2 and less than 1ppm NOx emissions. The purpose of this EPSRC proposal is to develop the knowledge required o materials performance inhigh pressure CO2/steam environments to support the conceptual design; many of the system components will operate at conditions not experiencedin other industrial systems and so little directly relevant information exist. The proposal comprises a review of the limited existing data from technologies with similar operating environments (e.g. advanced gas cooled reactors) and the execution of a systematic research programme to determine the oxidation/corrosion performance of current industrial and other candidate materials and coatings for duty in the CO2/steam environments of the GAS-ZEP system components - gas turbine, waste heat recovery boiler and CO2/steam separator | |
| Data | No related datasets |
|
| Projects | No related projects |
|
| Publications | No related publications |
|
| Added to Database | 01/01/07 | |