Reference Number ENW1006
Title Combined on-line Transformer Monitoring
Status Completed
Energy Categories Other Power and Storage Technologies(Electricity transmission and distribution) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
Electricity North West Limited
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 September 2014
End Date 01 September 2016
Duration ENA months
Total Grant Value £650,000
Industrial Sectors Power
Region North West
Programme
 
Investigators Principal Investigator Project Contact , Electricity North West Limited
Web Site https://smarter.energynetworks.org/projects/ENW1006
Objectives It is intended to use the online PD, DGA and acoustic monitoring techniques to monitor the condition of six 132kV transformers that have had their usable life extended by oil regeneration and refurbishment. This data will allow us to develop our understanding of the effects of life extension of failure mode and maintenance requirements of assets. The monitoring suit will be moved to other refurbished units to improve data validation and assess their conditions. To fully realise the benefits of this project we will work closely with the our academic partners University of Manchester and Liverpool University as well as our technology partner Camlin Power to analyse the data from condition monitoring suite to develop a more advanced transformer monitoring tools than currently exist.
Abstract As part of operating an efficient network operators need to maximize the use of existing assets by extending the asset life whilst maintaining system reliability and operator safety.Electricity North West intends to trial new advanced on-line transformer monitoring solutions developed by Camlin Power consisting of a dissolved gas analysis unit combined with a partial discharge monitoring unit to make up a new suite of combined on-line monitoring tools. The project will also include the trial of Acoustic monitoring technique of the tap changers which has been developed through IFI funding through Liverpool University.It is intended to monitor the condition of six 132kV transmission transformers that have had their usable life extended by oil regeneration and refurbishment. The units will be moved to other refurbished transformer to improve data validation and assess their conditions.It is expected that we will be able to more accurately asses transformer health indicess with collaboration with The University of Manchester and Liverpool University on data analysis. We will be able to diagnose issues as they arise, prolong the usable life of the transformers and improve operator safety by early detection and raising alarms of deterioration.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database 15/12/22