The Bidoyng Smart Fuse

Reference Number
ENWT1001
Title
The Bidoyng Smart Fuse
Status
Completed
Energy Categories
Other Power and Storage Technologies(Electricity transmission and distribution)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Electricity North West Limited
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 January 2012
End Date
01 December 2014
Duration
ENA months
Total Grant Value
£442,666
Industrial Sectors
Power
Region
North West
Programme
Investigators
Principal Investigator
Project Contact, Electricity North West Limited
Web Site
Objectives
The aim of the project is to install 200 smart fuse units and gateways in identified LV circuits. The smart fuse units are retrofitted to the LV fuse position in the LV fuse pillar with 3 smart fuse units installed per feeder (one on each phase). 200 units will provide coverage for 66 feeders and one gateway is needed in each substation that smart fuses are installed. The objective is to demonstrate the advantages of being able to automatically restore supplies to LV connected customers and to gather data about the performance such a device will deliver to the network. It is envisaged that other smart grid opportunities will arise once data has been gathered and evaluated.
Abstract
In recognition of the number of transient faults being experienced on Low Voltage (LV) distribution networks and the constant drive to improve customer service, Electricity North West Ltd and its partners initiated the Innovation Funding Incentive funded fuse restorer project in 2006. The aim of the project was to develop a device capable of carrying two LV fuses in a standard size fuse carrier that could automatically insert a secondary fuse into a circuit, following a transient fault to restore supplies to customers and then send an alarm notification to a nominated contact. Electricity North West Ltds partners delivered the final device, now known as the Bidoyng smart fuse. Three were installed on Electricity North West Ltds network in Wigan, Lancashire, where they successfully operated to restore supplies to over 100 connected customers following a transient fault. The smart fuse has been fully type tested (up to 50kA) and now provides a potential means to eliminate a significant proportion of transient faults based on developing a targeted installation strategy. During the development of the smart fuse, the debate on smart grids has developed significantly with the recognition that the LV network will become ever more important as domestic scale renewable energy generation is expected to play an ever greater part in the transition to a low carbon economy.