go to top scroll for more

NWTF

Reference Number
UKRI401
Title
NWTF
Status
Started
Energy Categories
Other Cross-Cutting Technologies or Research
Energy Efficiency(Transport)
Research Types
Equipment
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Professor JF Morrison
Aeronautics
Imperial College London
Award Type
Standard
Funding Source
EPSRC
Start Date
31 December 2024
End Date
01 July 2026
Duration
18 months
Total Grant Value
£330,000
Industrial Sectors
Unknown
Region
London
Programme
NC : Infrastructure
Investigators
Principal Investigator
Professor JF Morrison, Aeronautics, Imperial College London
Web Site
Objectives
Abstract
NWTF (http://www.nwtf.ac.uk/) is a UK leader and, over the next five years, will become a global leader in delivering cutting-edge science across a networked range of unique facilities in experimental fluid mechanics addressing the grand challenges of clean growth and the future of mobility across aerospace, automotive and civil engineering sectors. Through efficient and nimble organisation, it will provide strategic, coordinated oversight with an industrially aligned approach in the generation of new, net-zero technologies and knowledge in the efficiency of fluid-based systems, H2 and electric/hybrid transport, fluid-structure interaction, heating, noise, contaminant dispersion, particle transmission (Covid-19) and human factors, wind loading, coastal erosion and offshore renewables. NWTF continues to provide cutting-edge research, with its capacity measured by outputs and will augment this delta in terms of new science, research capacity and pace. It enables the development of new skills in original, challenging, highly relevant experiments, the provision of new data and the establishment of digital threads for AI, modelling and the rapid adoption of innovative techniques such as remote access and robotics. With an inclusive approach, NWTF provides interconnected facilities of world-class capability that are open to all UK-based researchers. In this way, NWTF provides a unified approach that is greater than the sum of its individual facilities, offering a single point of contact for industry, driving an innovation pipeline for a pull-through environment. NWTF is a hub and node organisation with 22 wind tunnels across 12 UK universities (nodes) and a centralised Project Manager (hub) who coordinates initiatives on behalf of the group. It has a Management Board (MB) comprising one member from each institution along with the NWTF hub Project Manager and representatives from EPSRC and the Aerospace Technology Institute (ATI). It meets quarterly, receiving inputs from a cross-disciplinary, international Advisory Board (AB) which meets bi-annually with members from Japan, France, Germany, Sweden and the United States. The AB consists mostly of experimental aerodynamicists from industry as well as academic colleagues, including those with interests in numerical prediction. With an initial EPSRC grant, EP/L024888/1 in 2014, NWTF solved the problem of under-investment in UK wind tunnels by establishing an equitable, excellence-based framework for tunnel membership. This successful model has recently attracted further investment from UKRI Infrastructure Award with a strong focus on green economic growth and human mobility, announced June 19, 2023, and administered via seven EPSRC awards with a start date July 1, 2024. This funding supports eleven new facilities at seven universities, transformational equipment at six additional universities and additional hub support. Network activities are supported by a Network grant, EP/X012069/1. The most recent UKRI Infrastructure award evolved from an EPSRC "Large Scale Research Infrastructure" process during which NWTF was asked to focus on transformational elements only, reducing the requested budget from 48.2m to 23.0m. The reduced value resubmission therefore removed all support for replacement items such as new lasers or operating system upgrades. The Core Equipment grant will fund these critical items to keep NWTF facilities operational by investing to save and enhancing the capability of these world-class wind tunnels.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
16/07/25