CCS Systems Modelling Tool-Kit

Reference Number
ETI-CC1003
Title
CCS Systems Modelling Tool-Kit
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(CO2 Capture and Storage, CO2 storage)
Fossil Fuels: Oil Gas and Coal(CO2 Capture and Storage, CO2 capture/separation)
Fossil Fuels: Oil Gas and Coal(CO2 Capture and Storage, CO2 transport)
Research Types
Applied Research and Development
Science and Technology Fields
PHYSICAL SCIENCES AND MATHEMATICS (Physics)
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
ENVIRONMENTAL SCIENCES (Earth Systems and Environmental Sciences)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Process Systems Enterprise Limited
Award Type
Institute Project
Funding Source
ETI
Start Date
16 September 2011
End Date
03 July 2017
Duration
70 months
Total Grant Value
£2,600,000
Industrial Sectors
Region
London
Programme
Carbon Capture and Storage
Investigators
Principal Investigator
Project Contact, Process Systems Enterprise Limited
Other Investigator
Project Contact, Rolls-Royce PLC
Project Contact, E.ON UK (formerly PowerGen)
Project Contact, E4Tech Ltd
Project Contact, Co2 Deepstore Ltd
Project Contact, EDF Energy
Web Site
Objectives
This project will help support the future design, operation and roll-out of cost effective carbon capture and storage (CCS) systems in the UK. It will create a modelling tool-kit capable of simulating the operation of all aspects of the CCS chain from capture and transport to storage and maintenance. The CCS System Modelling Tool-kit will be used to support the initial conceptual design and eventual detailed design and operation of CCS systems by helping to identify and understand the operational issues in the system such as the effect of a power station starting up, shutting down or increasing generation in response to power demands. It will benefit owners or developers of power stations who need to know the effect of CCS on their operations, future transport and storage operators, technology suppliers who will want to understand future requirements for their equipment and policy makers keen to understand issues around the overall CCS operation.
Abstract
A scoping study to identify the requirements for the project subsequently procured by the ETI to develop a CCS system modelling toolkit
Data

No related datasets

Projects

No related projects

Added to Database
10/10/18