CCS Next Generation Coal Capture Technology

Reference Number
ETI-CCS-4
Title
CCS Next Generation Coal Capture Technology
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(Coal, Coal combustion)
Fossil Fuels: Oil Gas and Coal(CO2 Capture and Storage, CO2 capture/separation)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (General Engineering and Mineral & Mining Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Costain Ltd
Award Type
Standard
Funding Source
ETI
Start Date
01 July 2011
End Date
30 October 2012
Duration
16 months
Total Grant Value
£3,500,000
Industrial Sectors
Manufacturing
Region
South East
Programme
Carbon Capture and Storage
Investigators
Principal Investigator
Project Contact, Costain Ltd
Other Investigator
Project Contact, Chemistry, Imperial College London
Web Site
Objectives

Development of the next generation of carbon capture technologies is seen as crucial to helping the UK meet its 2050 climate change targets. The ETI is working with Costain to deliver the project which will see a carbon capture pilot plant capable of capturing 95% of carbon dioxide emissions designed, built, operated and tested by the middle of 2015. The project is aimed at pre-combustion carbon capture applications, involving CO2 removal by physical separation and will be split into two parts.

The first part, lasting 16 months and costing 3.5m, will provide the front end engineering design for the demonstration unit. Costain will work with the University of Edinburgh, and Imperial College, London on the first stage, to help understand and optimise performance of the technology.

The ETI expects to invest 20.5m in the second stage, as the pilot plant is built, demonstrated and the results analysed. Demonstration is a key element to building user group confidence in the capture element. A potential site has been identified for the pilot plant, and will be reviewed and ranked against other options during the first part of the project.

Abstract
  • FEED Study for a CCS plant capable of capturing up to 95% of CO2 emissions from coal fired power stations
  • Project aimed at pre-combustion
  • Involved CO2 removal by physical separation

We have invested 3.5m to date in a project with Costain to design a carbon capture pilot plant capable of capturing up to 95% of CO2 emissions from coal fired power stations.

The project is aimed at pre-combustion carbon capture applications, involving CO2 removal by physical separation. Costain has produced a frontend engineering design study for a demonstration unit, working with the University of Edinburgh and Imperial College, London.