Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles

Reference Number
EP/L001004/1
Title
Battery Characterisation and Management - the key to Smart Grids and the Integration of Electric Vehicles
Status
Completed
Energy Categories
Energy Efficiency(Transport)
Other Power and Storage Technologies(Energy storage)
Research Types
Basic and strategic applied research
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Dr A Cruden
Faculty of Engineering and the Environment
University of Southampton
Award Type
Standard
Funding Source
EPSRC
Start Date
11 July 2013
End Date
28 April 2017
Duration
46 months
Total Grant Value
£1,338,720
Industrial Sectors
Energy
Region
South East
Programme
Energy : Energy
Investigators
Principal Investigator
Dr A Cruden, Faculty of Engineering and the Environment, University of Southampton
Other Investigator
Dr S Abu-Sharkh, School of Engineering Sciences, University of Southampton
Dr J Chen, Warwick Medical School, University of Warwick
Dr YM Chung, School of Engineering, University of Warwick
Professor PJ Hall, Chemical and Biological Engineering, University of Sheffield
Professor D G Infield, Electronic and Electrical Engineering, University of Strathclyde
Dr P A Jennings, School of Engineering, University of Warwick
Dr L Jiang, Electrical Engineering and Electronics, University of Liverpool
Dr DA Stone, Electronic and Electrical Engineering, University of Sheffield
Prof J Wang, School of Engineering, University of Warwick
Industrial Collaborator
Project Contact, Xuji Group Corporation, China
Project Contact, Scottish and Southern Energy plc
Project Contact, National Car Parks Ltd (NCP)
Project Contact, AG Holding Ltd (trading as Axeon)
Project Contact, Yuasa Battery UK Ltd
Project Contact, REAPsystems Ltd
Web Site
Objectives
Abstract
As recently as the 9th November 2012, the UK Chancellor, Mr George Osborne, stated in a speech to the Royal Society that "there is the challenge of storing more electricity for the Grid. Electricity demand peaks at around 60GW, whilst we have a grid capacity of around 80GW - but storage capacity of around just 3GW. Greater capability to store electricity is crucial for these power sources to be viable. It promises savings on UK energy spend of up to 10 billion a year by 2050 as extra capacity for peak load is less necessary." China, by contrast, has a grid capacity of over 1,000GW and an electrical demand growth rate of over 11% p.a, and in 2011 installed more wind capacity than the rest of the world put together. Concurrently, plans to clean up emissions from the transport sectors are leading to ambitious plans to expand the use of electric vehicles which will both challenge the electricity system due to the substantial need for battery charging, but also provide opportunity as these batteries can be used to provide energy storage.Hence the challenge for both the UK and China is, recognising the current global EV market is forecast to grow from 1.7 million units in 2012 to 5.3 million units in 2020, how to utilise this massive aggregate electrical energy storage capacity from EV batteries to deliver essential power network services such as frequency support, load levelling, 'firming' of renewable generation and so forth. The dual use of such vehicle energy storage (to provide its core vehicle transportation duty and grid support when connected to the network for recharging) is referred to as Vehicle-to-Grid (V2G) operation. V2G has many technical challenges to overcome as well as requiring careful cost benefit analysis of the effect of increased charge/discharge cycling of the battery, and associated degradation, versus the grid support benefits achieved.The dual use of EV batteries to provide grid support will make available very fast acting (<5 sec) and, crcially, low cost (Euro22/kW) aggregated energy storage, at cost levels significantly below dedicated grid battery installations (e.g. Euro3180/kW (@$1=Euro0.75) for the PGE 5MW, 1.25MWh Li-ion battery grid support project in Salem, Oregon, US) or competing energy storage technologies like compressed air energy storage (CAES).Critically this proposal aims to focus on V2G operation from a battery perspective 'upwards' and not from a network level 'downwards', as the key factors relating to the success of V2G are those concerned with the battery technology. The research challenges identified with this work are:1) Determining the anticipated patterns of battery cycling associated with driving and V2G operation for specified grid support functions e.g. frequency support, peak shaving etc.2) Investigating the impact of the anticipated V2G operation on battery cell, module and pack cycle life, failures and thermal behaviour (i.e. thermal cycling and impact on cold/hot battery charging behaviour). Additionally more accurate determination of battery state of charge (SoC) and state of health (SoH) is required, including ensuring cell balance within the battery pack.3) Investigating the communication and control temporal and physical information requirements from the battery management system (BMS) to the grid control system and vice versa.4) Demonstrating V2G operation within distinct UK and Chinese environments, employing the new BMS software with cycling/thermal control, and improved SoC/SoH prediction