go to top scroll for more

Assessment and Creation of Novel PE Pipe Repair Systems

Reference Number
NIA_CAD0018
Title
Assessment and Creation of Novel PE Pipe Repair Systems
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Cadent Gas
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 February 2018
End Date
01 May 2020
Duration
ENA months
Total Grant Value
£313,672
Industrial Sectors
Energy
Region
London
Programme
Network Innovation Allowance
Investigators
Principal Investigator
Project Contact, Cadent Gas
Other Investigator
Web Site
Objectives
Task 1 Initial acceptance testing:For each of the repair techniques, it will be necessary to identify any potential benefits the technique can offer over conventional systems, to assess any potential limitations of use in terms of site application and conditions, repair geometry and pressure containment capability, and to identify any perceived gaps. Task 2 Initial field trials of potential PE pipe repair systems:A series of field trials of the most promising systems identified. The first part of Task 2 will be to develop the appropriate G23 (field trial procedure) to enable use of the various repair systems on the low pressure GD network. There will also be a need to select a number of field trial sites. It is suggested that 4 techniques should be selected to cover the variety of potential systems currently available (5 applications of each of the 4 technique types). The installed repairs will be monitored over a period of time, initially 3-6 months is suggested. Task 3 Creation of training material:Rosen will develop and provide more operational guidance within GD Networks. Rosen will develop initial briefing material, probably in the form of an engineering bulletin, to inform network Operations Staff of the potential for use of these techniques. A briefing document will be developed and circulated to potential repair system providers by Rosen. Rosen will also provide an initial outline draft of procedures for the new repair methods. Rosen will provide support for the GD Networks in gaining industry wide approval for the finalised technical specification for methods of repairing leaking PE systems. The proposed scope of work falls into 3 Tasks: Task 1: Acceptance Testing to identify and assess suitable PE repair techniques. Task 2: Initial Field Trials Location of field trials TBC but will be split accordingly between Cadent and SGN Networks. Task 3: Creation of Training Material Creation of training material and draft procedures for the new repair techniques. To develop, approve and deliver potential permanent PE pipe repair systems for use within the GDNs this Project focuses on the initial acceptance testing and field use of several of these repair systems.
Abstract
Task 1 Initial acceptance testing:For each of the repair techniques, it will be necessary to identify any potential benefits the technique can offer over conventional systems,to assess any potential limitations of use in terms of site application and conditions, repair geometry and pressure containment capability,and to identify any perceived gaps.Task 2 Initial field trials of potential PE pipe repair systems:A series of field trials of the most promising systems identified. The first part of Task 2 will be to develop the appropriate G23 (field trialprocedure) to enable use of the various repair systems on the low pressure GD network. There will also be a need to select anumber of field trial sites. It is suggested that 4 techniques should be selected to cover the variety of potential systems currently available(5 applications of each of the 4 technique types). The installed repairs will be monitored over a period of time, initially 3-6 months issuggested.Task 3 Creation of training material:Rosen will develop and provide more operational guidance within GD Networks. Rosen will develop initial briefing material,probably in the form of an engineering bulletin, to inform network Operations Staff of the potential for use of these techniques. A briefingdocument will be developed and circulated to potential repair system providers by Rosen. Rosen will also provide an initial outline draft ofprocedures for the new repair methods. Rosen will provide support for the GD Networks in gaining industry wide approval forthe finalised technical specification for methods of repairing leaking PE systems.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
14/12/22