HyNTS FutureGrid Phase 1 – Transmission Test Facility NIC

Reference Number
NGGTGN04
Title
HyNTS FutureGrid Phase 1 – Transmission Test Facility NIC
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Hydrogen and Fuel Cells(Hydrogen, Other infrastructure and systems R&D)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
National Grid Gas Transmission
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 April 2021
End Date
31 December 2023
Duration
ENA months
Total Grant Value
£12,699,997
Industrial Sectors
Energy
Region
London
Programme
Investigators
Principal Investigator
Project Contact, National Grid Gas Transmission
Other Investigator
Project Contact, Northern Gas Network (NGN) North East
Industrial Collaborator
Project Contact, Northern Gas Networks
Web Site
Objectives
This project is a Network Innvoation Competition (NIC) Project. The project proposal document details all key deliverables, objectives and outcomes (including covering this requirement) as per Ofgems NIC Governance Document Version 3.1. The project proposal is available on the ENA portal under the the entry for the project NGGTGN04 - HyNTS FutureGrid Phase 1 – Transmission Test Facility This project is a Network Innvoation Competition (NIC) Project. The project proposal document details all key deliverables, objectives and outcomes (including covering this requirement) as per Ofgems NIC Governance Document Version 3.1. The project proposal is available on the ENA portal under the the entry for the project NGGTGN04 - HyNTS FutureGrid Phase 1 – Transmission Test Facility This project is a Network Innvoation Competition (NIC) Project. The project proposal document details all key deliverables, objectives and outcomes (including covering this requirement) as per Ofgems NIC Governance Document Version 3.1. The project proposal is available on the ENA portal under the the entry for the project NGGTGN04 - HyNTS FutureGrid Phase 1 – Transmission Test Facility
Abstract
Hydrogen has the potential to play a role in the decarbonisation of heat, power, and industry. Repurposing the NTS will minimise disruption, and potentially cost, for customers and consumers when developing a hydrogen NTS.The project will involve building a hydrogen test facility from a representative range of decommissioned NTS assets. Flows of hydrogen and natural gas blends (up to 100% hydrogen) will then be tested at NTS pressures, to better understand how hydrogen interacts with the assets. The data gathered will be used to assess the impact that a hydrogen conversion of NTS assets will have. The project will build on existing work under the HyNTS programme and increase understanding of the characteristics of hydrogen in the NTS, demonstrating what is required for hydrogen to be safely transported within the high-pressure GT system.