Reference Number
NIA_NGGT0024
Title
BIM (Building Information Modelling)
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
National Grid Gas Transmission
Award Type
Network Innovation Allowance
Total Grant Value
£202,000
Industrial Sectors
Manufacturing
Investigators
Principal Investigator
Project Contact, National Grid Gas Transmission
Objectives
The aim of this innovation project is to develop and trial an intelligent 3D modelling process based on Building Information Modelling (BIM) level 2 maturity, within an existing construction project.
Expected Benefits:
Attain knowledge of the BIM model in a working environment to understand if the intelligent 3D modelling process is fit for purpose within future National Grid construction projects.
Abstract
The current design process requires additional time and resources to develop specifications, process flow diagrams, and engineering line diagrams through to general arrangements. The process generates a number of Technical Queries (TQs) and Requests for Information (RFIs), requiring additional time and resource. It can take up to three further months for a design to go through the assurance process; including the conceptual design phase, developing the preliminary process and mechanical designs.