go to top scroll for more

Feasibility Study for Alternative Pipeline Materials

Reference Number
NIA_NGGT0048
Title
Feasibility Study for Alternative Pipeline Materials
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
National Grid Gas Transmission
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 January 2014
End Date
01 July 2014
Duration
6 months
Total Grant Value
£64,000
Industrial Sectors
Technical Consultancy
Region
London
Programme
Network Innovation Allowance
Investigators
Principal Investigator
Project Contact, National Grid Gas Transmission
Web Site
Objectives
To investigate the feasibility of using alternative materials, construction processes & technologies for pipelines in the National Grid Transmission Network. To complete a detailed review of alternative innovative materials and constructional processes appropriate to the National Transmission System.
Abstract
This project is the first stage of a study to investigate the feasibility of using alternative materials, novel construction processes and technologies for pipelines in the National Transmission Network (NTS). Through research and development into new innovative materials and techniques for high pressure natural gas pipelines there is the potential to drive efficiencies in new pipeline construction on the NTS. Phase 1 is a screening and technology survey comprising of three tasks: Task 1 - Alternative pipe materials screening and technology survey Task 2 - Alternative construction process and technologies screening and technology survey Task 3 - Operational performance requirements and screening of options Phase 1 will identify and then screen the available technologies (material and constructional) on the market to identify suitable solutions for further investigation and identify and define National Grid requirements. Following a stage gate Phase 2 will consist of a detailed feasibility review and gap analysis for each suitable technology. Phase 2 has not been costed at this stage as it is will be heavily dependent on the results from Phase 1.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above