Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control)
Reference Number
EP/W009706/1
Title
Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control)
Status
Started
Energy Categories
Renewable Energy Sources(Wind Energy)
Research Types
Basic and strategic applied research Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Dr C Edwards Department of Engineering University of Leicester
Award Type
Standard
Funding Source
EPSRC
Start Date
30 June 2023
End Date
29 June 2026
Duration
36 months
Total Grant Value
£436,700
Industrial Sectors
Systems engineering
Region
East Midlands
Programme
NC : Engineering
Investigators
Principal Investigator
Dr C Edwards, Department of Engineering, University of Leicester
Other Investigator
Professor MR Belmont, Engineering Computer Science and Maths, University of Exeter
Web Site
Objectives
Abstract
Offshore wind energy is becoming a major electricity provider with future expansion in deep water. Floating platforms can access water depths typically greater than 30 m, but have the disadvantage of platform motions due to combined waves and time varying thrust from turbine motion. Platform stabilisation is critically important for improving performance, reducing downtime and enabling safe access. Lost electrical output alone for a proposed 15 MW machine can be 20k per day at today's prices. Moreover, misalignment of the turbine axis with wind direction due to yaw and pitch causes power loss and undesirable blade stresses. In addition to pitch and surge in the wave direction, roll and yaw cross wave may occur due to multi-directional wave fields. Thus this project has two distinct aims both impacting on through life cost: Aim 1: to optimally minimise platform motion during power production by integrated (holistic) preview control of wave and wind effects on platform and turbines. A key reliability goal is to ensure acceleration at the nacelle due to pitch and surge is less than the recommended 0.2-0.3g, and to minimise damaging electrical surges and fatigue of structural components. Aim 2: to absolutely minimise platform motion for safe maintenance during personnel and material transfers by boat or helicopter and minimise debilitating motion effects on personnel during maintenance work. The illustrative case employed is the popular semi-sub floater concept which has comparatively shallow draft and simple deployment. Platform stabilisation will be achieved by combining: (i) pumped tank control between semi-sub columns to minimise pitch and roll as employed in ships, (ii) blade pitch control, already used in wind turbine control and (iii) yaw control for alignment with the wind direction. This multi-objective non-causal control problem requires future knowledge of both wave and wind forcing functions to achieve optimality.
Data
No related datasets
Projects
No related projects
Publications
No related publications
Added to Database
10/09/25