Projects in Region East of England involving Building Research Establishment Limited : InnUK/102238/01
Reference Number InnUK/102238/01
Title Renewable Integrated & Sustainable Electric Heating System (RISE Heating System)
Status Completed
Energy Categories Energy Efficiency(Residential and commercial) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 50%;
ENGINEERING AND TECHNOLOGY (Architecture and the Built Environment) 50%;
UKERC Cross Cutting Characterisation Not Cross-cutting 70%;
Sociological economical and environmental impact of energy (Consumer attitudes and behaviour) 15%;
Sociological economical and environmental impact of energy (Technology acceptance) 15%;
Principal Investigator Project Contact
No email address given
Building Research Establishment Limited
Award Type Collaborative Research & Development
Funding Source Innovate-UK
Start Date 01 August 2015
End Date 31 July 2017
Duration 24 months
Total Grant Value £488,995
Industrial Sectors
Region East of England
Programme Competition Call: 1405_CRD_ENE_GEN_ENCATMSR1 - Energy Catalyst - Mid Stage - Round 1. Activity Energy Catalyst Rnd 1 Mid Stage
 
Investigators Principal Investigator Project Contact , Building Research Establishment Limited (25.563%)
  Other Investigator Project Contact , Electrical Engineering and Electronics, University of Liverpool (24.949%)
Project Contact , EDF Energy Customer Field Services (Metering) Limited (20.450%)
Project Contact , Eastbourne Homes Limited (4.498%)
Project Contact , GDC Group Limited (24.540%)
Web Site
Objectives
Abstract In the UK there over 25 million domestic dwellings. More than 80% of these homes depend on gas boilers to provide space and hot water heating. Against the context of dwindling UK gas reserves, increased sensitivity to gas supplies sourced internationally and the potential for unsustainable growth in peak time electricity generation, there is a growing imperative to seek alternative heating systems. RISE (Renewable Integrated & Sustainable Electric Heating System) is such an alternative, all-electric heat pump with storage heating system that avoids the use of peak time power. The RISE Project will build on the earlier technical validation of the concept, to carry out live trials in up to four apartments in a multi-dwelling unit (MDU) in Eastbourne. This live demonstration will utilise optimising controls to simulatenaously control the occupants thermal comfort needs and the electricity demand proflies to provide a Smart Grid approach to sustainable heating for the UK, in real time. The project schedule is to start April 2015, with live trials starting in October 2015, with the performance monitoring. The project's outputs will support RISE towards commercialisation and manufacture.In the UK there over 25 million domestic dwellings. More than 80% of these homes depend on gas boilers to provide space and hot water heating. Against the context of dwindling UK gas reserves, increased sensitivity to gas supplies sourced internationally and the potential for unsustainable growth in peak time electricity generation, there is a growing imperative to seek alternative heating systems. RISE (Renewable Integrated & Sustainable Electric Heating System) is such an alternative, all-electric heat pump with storage heating system that avoids the use of peak time power. The RISE Project will build on the earlier technical validation of the concept, to carry out live trials in up to four apartments in a multi-dwelling unit (MDU) in Eastbourne. This live demonstration will utilise optimising controls to simulatenaously control the occupants thermal comfort needs and the electricity demand proflies to provide a Smart Grid approach to sustainable heating for the UK, in real time. The project schedule is to start April 2015, with live trials starting in October 2015, with the performance monitoring. The project's outputs will support RISE towards commercialisation and manufacture.In the UK there over 25 million domestic dwellings. More than 80% of these homes depend on gas boilers to provide space and hot water heating. Against the context of dwindling UK gas reserves, increased sensitivity to gas supplies sourced internationally and the potential for unsustainable growth in peak time electricity generation, there is a growing imperative to seek alternative heating systems. RISE (Renewable Integrated & Sustainable Electric Heating System) is such an alternative, all-electric heat pump with storage heating system that avoids the use of peak time power. The RISE Project will build on the earlier technical validation of the concept, to carry out live trials in up to four apartments in a multi-dwelling unit (MDU) in Eastbourne. This live demonstration will utilise optimising controls to simulatenaously control the occupants thermal comfort needs and the electricity demand proflies to provide a Smart Grid approach to sustainable heating for the UK, in real time. The project schedule is to start April 2015, with live trials starting in October 2015, with the performance monitoring. The project's outputs will support RISE towards commercialisation and manufacture.In the UK there over 25 million domestic dwellings. More than 80% of these homes depend on gas boilers to provide space and hot water heating. Against the context of dwindling UK gas reserves, increased sensitivity to gas supplies sourced internationally and the potential for unsustainable growth in peak time electricity generation, there is a growing imperative to seek alternative heating systems. RISE (Renewable Integrated & Sustainable Electric Heating System) is such an alternative, all-electric heat pump with storage heating system that avoids the use of peak time power. The RISE Project will build on the earlier technical validation of the concept, to carry out live trials in up to four apartments in a multi-dwelling unit (MDU) in Eastbourne. This live demonstration will utilise optimising controls to simulatenaously control the occupants thermal comfort needs and the electricity demand proflies to provide a Smart Grid approach to sustainable heating for the UK, in real time. The project schedule is to start April 2015, with live trials starting in October 2015, with the performance monitoring. The project's outputs will support RISE towards commercialisation and manufacture.In the UK there over 25 million domestic dwellings. More than 80% of these homes depend on gas boilers to provide space and hot water heating. Against the context of dwindling UK gas reserves, increased sensitivity to gas supplies sourced internationally and the potential for unsustainable growth in peak time electricity generation, there is a growing imperative to seek alternative heating systems. RISE (Renewable Integrated & Sustainable Electric Heating System) is such an alternative, all-electric heat pump with storage heating system that avoids the use of peak time power. The RISE Project will build on the earlier technical validation of the concept, to carry out live trials in up to four apartments in a multi-dwelling unit (MDU) in Eastbourne. This live demonstration will utilise optimising controls to simulatenaously control the occupants thermal comfort needs and the electricity demand proflies to provide a Smart Grid approach to sustainable heating for the UK, in real time. The project schedule is to start April 2015, with live trials starting in October 2015, with the performance monitoring. The project's outputs will support RISE towards commercialisation and manufacture.