go to top scroll for more

Beyond Visual Line of Sight Aerial Inspection Vehicle

Reference Number
NIA_SGN0035
Title
Beyond Visual Line of Sight Aerial Inspection Vehicle
Status
Completed
Energy Categories
Other Power and Storage Technologies(Electricity transmission and distribution)
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Scottish and Southern Energy Power Distribution
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 March 2014
End Date
30 September 2015
Duration
19 months
Total Grant Value
£567,111
Industrial Sectors
Manufacturing
Region
Scotland
Programme
Network Monitoring
Investigators
Principal Investigator
Project Contact, Scottish and Southern Energy Power Distribution
Other Investigator
Project Contact, Northern Powergrid
Project Contact, Northern Gas Networks
Project Contact, SGN
Project Contact, UK Power Networks
Project Contact, SP Energy Networks
Web Site
Objectives
The objective of this project is to :
  • Identify what operational requirements the GDNs and DNOs might have for RPAS BVLOS.
  • Create a simulation environment based on real sections of the GDNs and DNOs networks.
  • Use the simulation environment to develop the specification(s) that will achieve the GDNs and DNOs operational requirements whilst also meeting the CAAs criteria.
  • Use the simulation environment to demonstrate the specification to the GDNs, DNOs and CAA.
  • Deliver a specification(s), confirmed by the CAA that is one step towards developing a RPAS BVLOS for which CAA approval can be secured.
Expected Benefits: The success criteria for the project are:
  • The RPAS BVLOS requirements for the GDNs and DNOs are identified.
  • The costs of developing RPAS BVLOS capability are quantified and justified.
  • An RPAS BVLOS specification(s) is developed and agreed by the CAA..
The GDNs and DNOs are in a position to decide on whether to develop this specification(s) knowing that the potential system has the best chance of being compliant when presented to the CAA for approval.
Abstract
The scope of this 1.5 year programme of work by VTOL Technologies is to develop an RPAS BVLOS specification that is endorsed by the CAA which can then be used to develop a RPAS BVLOS system (not part of this project).
The project will contain four stages :
  • Stage 1: BVLOS Requirements Gathering (6 months).
  • Stage 2: Developing the Simulation Environment (4 months).
  • Stage 3: Assessing Requirements (4 months).
  • Stage 4: An Industry Standard BVLOS Specification (4 months).
Data

No related datasets

Projects

No related projects

Added to Database
28/09/16