Projects: Summary of Projects by RegionProjects in Region Scotland involving Scottish and Southern Energy plc : NIA_SHET_0035 |
||
Reference Number | NIA_SHET_0035 | |
Title | TOTEM (Transmission Owner Tools for EMT Modelling) Extension | |
Status | Completed | |
Energy Categories | Other Cross-Cutting Technologies or Research(Energy Models) 50%; Other Power and Storage Technologies(Electricity transmission and distribution) 50%; |
|
Research Types | Applied Research and Development 100% | |
Science and Technology Fields | ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100% | |
UKERC Cross Cutting Characterisation | Systems Analysis related to energy R&D (Energy modelling) 100% | |
Principal Investigator |
Project Contact No email address given SSEN Scottish Hydro Electric Transmission |
|
Award Type | Network Innovation Allowance | |
Funding Source | Ofgem | |
Start Date | 01 May 2022 | |
End Date | 31 March 2023 | |
Duration | ENA months | |
Total Grant Value | £437,000 | |
Industrial Sectors | Power | |
Region | Scotland | |
Programme | Network Innovation Allowance | |
Investigators | Principal Investigator | Project Contact , SSEN Scottish Hydro Electric Transmission (99.997%) |
Other Investigator | Project Contact , National Grid Electricity Transmission (0.001%) Project Contact , National Grid ESO (0.001%) Project Contact , SPEN - SP Transmission Plc (0.001%) |
|
Industrial Collaborator | Project Contact , National Grid plc (0.000%) Project Contact , Scottish and Southern Energy plc (0.000%) Project Contact , SP Energy Networks (0.000%) Project Contact , National Grid Electricity Transmission (0.000%) |
|
Web Site | https://smarter.energynetworks.org/projects/NIA_SHET_0035 |
|
Objectives | Manitoba Hydro International (MHI) is a world leader in power system simulation and has developed a way to study electromagnetic transient (EMT) behaviour on large systems, like the full GB transmission system, using the PSCAD simulation software. This project proposes to have MHI develop and validate a full-scale model in PSCAD for the GB transmission system. The project scope will be to;• Develop new tools for automatic reduction of the PSCAD model to produce both static and dynamic equivalents of the reduced areas;• Develop new tools for configuration and quick initialisation of the EMT models to support future work by the Transmission Owners (TOs);• Perform illustrative studies based on the developed PSCAD network including;- sub-synchronous resonance investigations- control instability studies- switching studies on a selection of substations• Participate in a knowledge transfer workshop to provide the TOs and ESO with the capability to use the models, extend them as required in the future, and perform a range of studies. The objectives of the project are as follows:1. Validate a PSCAD model of the GB transmission network and from that derive separate models for each of the three TO licence areas;2. Deliver tools for PSCAD model manipulation and analysis that will support the TOs and the ESO in their use of the GB model;3. Provide the GB TOs and ESO with the knowledge and understanding required to adopt the models and put them into use; and4. Install shared computing resources for running the most complex models. | |
Abstract | Continuation of NIA_SHET_0032 TOTEM, to complete the development and associated validation of a full-scale model of the GB Transmission System in electromagnetic transient (EMT) PSCAD simulation software. | |
Data | No related datasets |
|
Projects | No related projects |
|
Publications | No related publications |
|
Added to Database | 14/10/22 |