go to top scroll for more

Injection Moulding Process Intensification

Reference Number
2003-11-232-7
Title
Injection Moulding Process Intensification
Status
Completed
Energy Categories
Energy Efficiency(Industry)
Research Types
Basic and strategic applied research
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Dr JFT Pittman
Engineering
Swansea University
Award Type
3
Funding Source
Carbon Trust
Start Date
01 July 2004
End Date
30 September 2005
Duration
15 months
Total Grant Value
£103,993
Industrial Sectors
Region
Wales
Programme
Investigators
Principal Investigator
Dr JFT Pittman, Engineering, Swansea University
Web Site
Objectives
To develop energy efficient injection moulding technology for plastics by means of optimised process intensification
Abstract
The UK injection moulding sector uses approximately 1600 GWh/yr of grid electricity. Actions for energy efficiency have been identified, giving considerable scope for economies leading to reduced CO2 emissions. Cooling and solidification of the plastic occupies around 75% of the moulding cycle, and acceleration of cooling offers significant productivity gains and energy savings. Additionally, conventional processing uses energy wastefully. This proposal addresses the problem through a novel combination of technological steps: Thermal intensification of the process is applied, made possible by confining temperature changes to a low thermal mass in the tool; Novel techniques for tool fabrication are proposed; Energy normally wasted is usefully recovered; System design and operation is optimised using process simulation software. Development of the proposed technology will lead not only to CO2 reductions, but will also improve the competitiveness of UK moulders through reduced energy costs, higher production rates, part weight reduction and lower tonnage machines. This project forms the first phase of a two-part project. The objectives of Phase1 are to produce detailed optimised designs. A future Phase 2 will build and trial the new technology based on these designs
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
01/01/07