go to top scroll for more

Bioturbine

Reference Number
B/W3/00812/00/00
Title
Bioturbine
Status
Completed
Energy Categories
Other Power and Storage Technologies(Electric power conversion)
Renewable Energy Sources(Bio-Energy, Applications for heat and electricity)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Bioturbines Ltd
Award Type
Standard
Funding Source
DTI
Start Date
18 October 2005
End Date
17 July 2006
Duration
9 months
Total Grant Value
£600,000
Industrial Sectors
Power
Region
South East
Programme
BIO-MASS
Investigators
Principal Investigator
Project Contact, Bioturbines Ltd
Other Investigator
Project Contact, Cavendish Management Resources Ltd
Project Contact, Tube Bending Solutions Ltd
Web Site
Objectives
Grant funding, in addition to private investment, is required to take the project from the current, patented small scale “proof of concept” stage, to the point when a pre-production design can be licensed, achieving a biomass fuel burn of 90% by energy in a gas turbine, whilst meeting current emissions legislation. Whilst the development programme will be based on clean wood fuel, a wider range of biofuels will be tested. The project objective is to demonstrate theviability of low capital and operating cost wood fuelled CHP, for an output range of between 250kWe and 1MWe. The R&D will establish operating parameters for the gas turbine, combustion, feed system and the control technology required for a realistic range of wood fuel type, size and moisture content.
Abstract
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
01/01/07