go to top scroll for more

Fracture Detection While Drilling and Optimised Stimulation

Reference Number
InnUK/131872/01
Title
Fracture Detection While Drilling and Optimised Stimulation
Status
Completed
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Other oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
ENVIRONMENTAL SCIENCES (Earth Systems and Environmental Sciences)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Smart Reamer Drilling Systems Limited
Award Type
Feasibility Study
Funding Source
Innovate UK
Start Date
01 April 2015
End Date
31 March 2016
Duration
12 months
Total Grant Value
£100,889
Industrial Sectors
Region
South East
Programme
Competition Call: 1406_FS_ENRG_SG - Shale Gas. Activity Developing technologies for safe and responsible exploration of shale gas
Investigators
Principal Investigator
Project Contact, Smart Reamer Drilling Systems Limited
Other Investigator
Project Contact, BG International Limited
Web Site
Objectives
Abstract
This project proves whether shale gas fracture pathways can be identified by using the Smart Reamer. If proven, this will validate a lucrative Smart Frac system. Potentially, this project is a game changer as it maximises production by locating natural fractures (better fracturing job) and sets the ideal location for hydraulic fracture stimulation (wellbore isolation devices). It eliminates cycles of entry and exit into the wellbore with wireline. The concept is patent pending in the US, and a PCT for Brazil, China, Gulf Cooperation Countries. The project builds on the successful Smart Reamer TSB 720002 and harnesses the expertise of BG and Smart drilling in an exciting new technology for fracture detection. Oil companies will be provided with data that is currently missing between drilling and completing a well. TSB funding will support such validation and help allay certain socio-environmental concerns. Oil and Gas end users are backing the Smart Frac and will facilitate further development of the Smart Frac system. The project will allow the concept to maximise UK shale gas recovery while providing assurance on environmental monitoring downhole.This project proves whether shale gas fracture pathways can be identified by using the Smart Reamer. If proven, this will validate a lucrative Smart Frac system. Potentially, this project is a game changer as it maximises production by locating natural fractures (better fracturing job) and sets the ideal location for hydraulic fracture stimulation (wellbore isolation devices). It eliminates cycles of entry and exit into the wellbore with wireline. The concept is patent pending in the US, and a PCT for Brazil, China, Gulf Cooperation Countries. The project builds on the successful Smart Reamer TSB 720002 and harnesses the expertise of BG and Smart drilling in an exciting new technology for fracture detection. Oil companies will be provided with data that is currently missing between drilling and completing a well. TSB funding will support such validation and help allay certain socio-environmental concerns. Oil and Gas end users are backing the Smart Frac and will facilitate further development of the Smart Frac system. The project will allow the concept to maximise UK shale gas recovery while providing assurance on environmental monitoring downhole.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database
04/12/17