Reference Number
InnUK/132109/01
Title
Vertical supply chain integration to deliver high volume ultra-low energy offsite construction
Energy Categories
Energy Efficiency(Residential and commercial)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Architecture and the Built Environment)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Citu Developments LLP
Award Type
Feasibility Study
Funding Source
Innovate UK
Start Date
01 October 2015
Total Grant Value
£114,067
Region
Yorkshire & Humberside
Programme
Competition Call: 1503_FS_BUIL_ECCSC - Supply Chain Integration in Construction. Activity Supply chain integration in construction
Investigators
Principal Investigator
Project Contact, Citu Developments LLP
Abstract
To meet the target of decreasing CO2 emissions by 80% by 2050, new house builds must improve energy performance by up to 80%, whilst the rate of construction must also double. The traditional supply chain structure between end user and product suppliers means that the potential to capture innovation from product suppliers and exploit this in a cohesive ultra-low energy (ULE, e.g. Passivhaus) end product is often lost due to the inherent segregation of client, contractor and product suppliers. Citu developments LLP will collaborate with Leeds Beckett University to develop the first industrial scale ULE offsite construction system, based on Passivhaus type concepts, but designed for UK brownfield applications where build form and orientation cannot always be optimised for energy efficiency. This project will investigate the feasibility of vertically integrating suppliers and an industrial manufacturing process with unprecedented quality/control into a viable business model for commercial exploitation, to optimise the energy efficiency of a particular site at a fraction of the cost of existing energy-efficient technologies.To meet the target of decreasing CO2 emissions by 80% by 2050, new house builds must improve energy performance by up to 80%, whilst the rate of construction must also double. The traditional supply chain structure between end user and product suppliers means that the potential to capture innovation from product suppliers and exploit this in a cohesive ultra-low energy (ULE, e.g. Passivhaus) end product is often lost due to the inherent segregation of client, contractor and product suppliers. Citu developments LLP will collaborate with Leeds Beckett University to develop the first industrial scale ULE offsite construction system, based on Passivhaus type concepts, but designed for UK brownfield applications where build form and orientation cannot always be optimised for energy efficiency. This project will investigate the feasibility of vertically integrating suppliers and an industrial manufacturing process with unprecedented quality/control into a viable business model for commercial exploitation, to optimise the energy efficiency of a particular site at a fraction of the cost of existing energy-efficient technologies.
Added to Database
13/02/18