Projects: Projects for Investigator |
||
Reference Number | GR/T27235/01 | |
Title | Cable Pipes: Cost Effective, Environmentally Friendly Electricity Transmission Using Trenchless Burial Methods | |
Status | Completed | |
Energy Categories | Other Power and Storage Technologies(Electricity transmission and distribution) 100%; | |
Research Types | Basic and strategic applied research 100% | |
Science and Technology Fields | ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 50%; ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 50%; |
|
UKERC Cross Cutting Characterisation | Not Cross-cutting 100% | |
Principal Investigator |
Professor CDF Rogers No email address given Infra. Engineering & Management University of Birmingham |
|
Award Type | Standard | |
Funding Source | EPSRC | |
Start Date | 01 April 2005 | |
End Date | 30 September 2006 | |
Duration | 18 months | |
Total Grant Value | £106,784 | |
Industrial Sectors | Energy | |
Region | West Midlands | |
Programme | Process Environment and Sustainability | |
Investigators | Principal Investigator | Professor CDF Rogers , Infra. Engineering & Management, University of Birmingham (99.999%) |
Other Investigator | Dr D Chapman , Civil Engineering, University of Birmingham (0.001%) |
|
Industrial Collaborator | Project Contact , Advanced Specialist Moulders Ltd (0.000%) Project Contact , Charador Pipeline Services Ltd (0.000%) Project Contact , Plasticpipes (0.000%) |
|
Web Site | ||
Objectives | ||
Abstract | Off shore wind farms, sensitive urban areas and environmental pressures create problems for power transmission pylons. The alternative is cable burial. However, open cut trenching is both disruptive and expensive, and in many situations provides an unacceptable alternative. This project (which is to be carried out jointly with Newcastle University) aims to determine the feasibility of current technology to install high voltage cables in relatively large (0.8 - 2.0 m) diameter pipelines constructed without trenches in long (at least 2 km) runs and, if necessary, define further research and development that would facilitate such construction. The technologies that have the potential to make high power underground electrical transmission viable are trenchless cable installation, high power solid-state electronic switching and advance polymeric materials. These are the areas of expertise in the Birmingham and Newcastle groups.Although each aspect of the proposed work is novel in itself,it is the combination of elevated temperatures on soil, liner and pipeline performance, trenchless cable installation well beyond current limitations (a novel form of liner creation in situ is inevitable), electrical supply systems well beyond current capabilities, adequate cooling systems operating over large distances, and novel polymeric materials and structures to support the cables given the necessary range of operating conditions that makes the proposed research uniquely novel. The Birmingham element of the research programme will investigate the physical installation processes in terms of the capabilities of current and future trenchless technologies, produce a specification for the proposed trenchless methods, carry out design and analysis of the proposed methods and, with Newcastle, design up to three representative installations | |
Data | No related datasets |
|
Projects | No related projects |
|
Publications | No related publications |
|
Added to Database | 01/01/07 |