This document is a Network Innovation Allowance Progress Report for the 13kV Shunt Reactor Refurbishment project for 2014. The scope of the project covers the relocation of a failed 13kV 2x30MVA shunt reactor (English Electric design) from Willesden substation, London to ABB, Drammen, Norway for inspection; technical teardown (to include recommendations on refurbishment options); redesign and if economically feasible, manufacture of the active part; refurbishment of reactor tank and cooler bank (with option to replace cooler bank with modern equivalent); factory acceptance test of refurbished unit to modern standards and installation and commissioning of the refurbished reactor in its original location at Willesden substation i.e. the reactor will reuse the existing plinth therefore negating the need for extensive civil works.Publication Year:
2014
Publisher:
Ofgem
DOI:
No DOI minted
Author(s):
National Grid Electricity Transmission
Energy Category
Class Name:
Subclass Name:
Category Name:
Language:
English
File Type:
application/pdf
File Size:
44021 B
Rights:
Rights not recorded
Rights Overview:
Rights are not recorded within the edc, check the data source for details
Further information:
N/A
Region:
United Kingdom
Related Dataset(s):
No related datasets
Related Project(s):
Related Publications(s):