This document is a Network Innovation Allowance Progress Report for the 13kV Shunt Reactor Refurbishment project for 2014. The scope of the project covers the relocation of a failed 13kV 2x30MVA shunt reactor (English Electric design) from Willesden substation, London to ABB, Drammen, Norway for inspection; technical teardown (to include recommendations on refurbishment options); redesign and if economically feasible, manufacture of the active part; refurbishment of reactor tank and cooler bank (with option to replace cooler bank with modern equivalent); factory acceptance test of refurbished unit to modern standards and installation and commissioning of the refurbished reactor in its original location at Willesden substation i.e. the reactor will reuse the existing plinth therefore negating the need for extensive civil works.

Publication Year:

2014

Publisher:

Ofgem

DOI:

No DOI minted

Author(s):

National Grid Electricity Transmission

Energy Category

Language:

English

File Type:

application/pdf

File Size:

44021 B

Rights:

Rights not recorded

Rights Overview:

Rights are not recorded within the edc, check the data source for details

Further information:

N/A

Region:

United Kingdom

Publication Type:

Project Report

Theme(s):

Placeholder Theme

Related Dataset(s):

No related datasets