Abstract:
This document is a closedown report for the project titled 'Alternative Tower Construction'.
The project focussed on initial development, production and implementation of an adapted emergency bypass tower as a tower crane which could be used to erect and dismantle transmission towers at 275kV and above. Following mechanical and functional testing within a controlled environment, field based testing on a number of selected towers was to be completed to allow demonstration of the system on the SHE (Scottish Hydro Electric) Transmission. This would allow an assessment to be made of the suitability of the system and method for operational use going forward.
The principle aim of the project was to assess the suitability of the tower crane as a tool for the erection and dismantlement of transmission towers in a safe and sustainable manner.
This report contains and Executive Summary, and is divided into the following sections:Publication Year:
2015
Publisher:
Ofgem
DOI:
No DOI minted
Author(s):
Scottish and Southern Energy Power Distribution
Energy Category
Class Name:
Subclass Name:
Category Name:
Language:
English
File Type:
application/pdf
File Size:
569163 B
Rights:
Rights not recorded
Rights Overview:
Rights are not recorded within the edc, check the data source for details
Further information:
N/A
Region:
United Kingdom
Related Dataset(s):
No related datasets
Related Project(s):
Related Publications(s):
No related publications