go to top scroll for more

Alternative Tower Construction: Final Report

This resource links to a document we hold in our system

Abstract:

This document is a closedown report for the project titled 'Alternative Tower Construction'.

The project focussed on initial development, production and implementation of an adapted emergency bypass tower as a tower crane which could be used to erect and dismantle transmission towers at 275kV and above. Following mechanical and functional testing within a controlled environment, field based testing on a number of selected towers was to be completed to allow demonstration of the system on the SHE (Scottish Hydro Electric) Transmission. This would allow an assessment to be made of the suitability of the system and method for operational use going forward.

The principle aim of the project was to assess the suitability of the tower crane as a tool for the erection and dismantlement of transmission towers in a safe and sustainable manner.

This report contains and Executive Summary, and is divided into the following sections:
  1. Project Background
  2. Scope and Objectives
  3. Success Criteria
  4. Details of the work carried out
  5. Outcomes
  6. Appendix

Publication Year:

2015

Publisher:

Ofgem

DOI:

No DOI minted

Author(s):

Scottish and Southern Energy Power Distribution

Energy Category

Language:

English

File Type:

application/pdf

File Size:

569163 B

Rights:

Rights not recorded

Rights Overview:

Rights are not recorded within the edc, check the data source for details

Further information:

N/A

Region:

United Kingdom

Publication Type:

Project Report

Theme(s):

Placeholder Theme

Related Dataset(s):

No related datasets

Related Publications(s):

No related publications