Alternative Riser Pipe Jointing Method - Pyplok: Progress Report 2015

This resource links to a document we hold in our system

Abstract:

The scope of this project includes:

  • Review current information regarding the Pyplok system
  • Define functional requirements of alternative steel fittings for use on gas riser systems, such as Pyplok
  • Conduct approval testing of Pyplok
  • Field trial Pyplok

    The aim of this project is to assess Pyplok technology to establish its suitability for the application of an alternative jointing method for steel risers, which removes the need for welding (which requires hot work permits) or screwed fittings which can only be used up to 2" diameter. The project will ascertain the testing which is required to ensure that the product is fit for purpose.

    The project was split into 2 stages:

    • Stage 1 involved the confirmation of the approvals route of the project, a draft test specification. A final report was produced from Stage 1, which outlines the test specification and has a plan for Stage 2 of the project when we are undertaking the gap closure testing. This Project Progress Report gives an overview of this Stage 1 report.
    • Stage 2 determined costs, a final test specification and a gap closure action plan.

    Following the initial Pyplok information review and determination of the expected functional requirements, DNV GL have determined a test specification for an alternative riser jointing method merging together existing Gas Industry Specifications and National Grid specifications, as well as using their engineering judgements and knowledge on building regulations and potential changes to the building regulations with respect to fire resistance. A comparison was then made between the test specification that DNV GL have prepared and the testing and approvals that Pyplok already has.

    The gap between the tests required and the approvals already held is the testing to be undertaken in Stage 2 of the project, along with the preliminary work for live field trials in Stage 3.

    It has become apparent during the project that early engagement with operational departments has ensured that field trials (and associated activities) can be planned and completed easily, leading to the project to run with minimal delays. There will need to be some further trials conducted following the project to move the method to the next TRL level and embed into the business. The Pyplok method, if successful, will be used in conjunction with traditional riser jointing techniques, especially as a replacement when appropriate to welding.

    This report covers the project's:
  • Scope
  • Objectives
  • Success Criteria
  • Performance Compared to the Original Project Aims, Objectives and Success Criteria
  • Required Modifications to the Planned Approach During its Course
  • Lessons Learnt for Future Projects
  • Publication Year:

    2015

    Publisher:

    Ofgem

    DOI:

    No DOI minted

    Author(s):

    National Grid Gas Distribution

    Energy Category

    Language:

    English

    File Type:

    application/pdf

    File Size:

    48515 B

    Rights:

    Rights not recorded

    Rights Overview:

    Rights are not recorded within the edc, check the data source for details

    Further information:

    N/A

    Region:

    United Kingdom

    Publication Type:

    Project Report

    Theme(s):

    Placeholder Theme

    Related Dataset(s):

    No related datasets

    Related Publications(s):

    No related publications