Architectural Design of Compressor Site Architectural Design of Compressor Site: Final Report

This resource links to a document we hold in our system

Abstract:

This document is a closedown report for the project titled 'Architectural Design of Compressor Site'.

National Grid has to operate in an ever more stringent planning environment. The implementation of the Planning Act 2008 has resulted in all Nationally Significant Infrastructure Projects being captured by the Planning Act. The result of this has been a greater responsibility on a developer to provide evidence that a full and open engagement has been undertaken with both statutory and non statutory organisations and particularly the public at large and further that opinions expressed by third parties have been properly noted and where possible used to influence the final design submitted for consent to the Planning Inspectorate.

National Grid is committed to being the industry leader in the implementation of the requirements of the Planning Act. To this end, where National Grid is required to construct an above ground installation, it is imperative that they investigate fully all alternatives available to minimise the impact of the development on its environment and those who live in that environment. As part of the early stages of the public consultations on the Don Valley Power CCS project, preliminary compressor site design drawings and animations were created for three different design options:
  1. Contemporary
  2. Farmstead
  3. Landscaped
The overwhelming preference from the public was for the landscape design (i.e. the environmental option).

This project will explore three environmentally sensitive architectural design alternatives that will be suitable for a typical compressor site, based on size (one small, two medium).

This report covers the project's:
  • Scope
  • Objectives
  • Success Criteria
  • Performance Compared to the Original Project Aims, Objectives and Success Criteria
  • Required Modifications to the Planned Approach During its Course
  • Lessons Learnt for Future Projects
  • Outcomes
  • Planned Implementation
  • Other Comments
  • Publication Year:

    2014

    Publisher:

    Ofgem

    DOI:

    No DOI minted

    Author(s):

    National Grid Gas Transmission

    Energy Category

    Language:

    English

    File Type:

    application/pdf

    File Size:

    59636 B

    Rights:

    Rights not recorded

    Rights Overview:

    Rights are not recorded within the edc, check the data source for details

    Further information:

    N/A

    Region:

    United Kingdom

    Publication Type:

    Project Report

    Theme(s):

    Placeholder Theme

    Related Dataset(s):

    No related datasets

    Related Publications(s):

    No related publications