1MW Shetland NaS Battery: Final Report

This resource links to a document we hold in our system

Abstract:

This report presents the findings from the Scottish Hydro Electric Power Distribution (SHEPD) Low Carbon Networks Fund (LCNF) Tier 1 project "1MW Battery, Shetland". The project commenced in 2010 with the aim of installing a grid scale energy storage device on the SHEPD network in Shetland and integrating this with an active network management system. The success criteria for the project were to: "reduce the peak demand on Lerwick Power Station"; for the battery to "cycle efficiently to meet the needs and profiles of the islands' generation and demand"; and to increase the knowledge and understanding of "battery operation within a network environment". The project has generated significant learning in key areas including: procurement, design, construction, installation, commissioning and safety. Time has been taken to detail knowledge items, necessary for project replication, which may benefit future projects. This experience has fed into the Energy Storage Operators Forum - established by SHEPD during the project - and ensures knowledge transfer to UK Distribution Network Operators. With the Tier 1 objectives complete, the battery energy storage system will continue to be trialled and evaluated under the Northern Isles New Energy Solutions (NINES) project.

Publication Year:

2014

Publisher:

Ofgem

DOI:

No DOI minted

Author(s):

SSEN Power Distribution

Energy Categories

Language:

English

File Type:

application/pdf

File Size:

1248533 B

Rights:

Rights not recorded

Rights Overview:

Rights are not recorded within the edc, check the data source for details

Further information:

N/A

Region:

United Kingdom

Publication Type:

Project Report

Theme(s):

Placeholder Theme

Related Dataset(s):

No related datasets

Related Project(s):

1MW Shetland NaS Battery

Related Publications(s):

No related publications