go to top scroll for more

Projects

Projects: Custom Search

Reference Number
UKERC.05.02.WSNF01
Title
Community Co-creation for Transparent Electricity System Modelling of Energy Storage
Status
Started
Energy Categories

Other Cross-Cutting Technologies or Research (Demographics)

Other Cross-Cutting Technologies or Research (Energy Models)

Other Power and Storage Technologies (Energy storage)

Other Cross-Cutting Technologies or Research (Environmental, social and economic impacts)

Research Types
Basic and strategic applied research
Science and Technology Fields
SOCIAL SCIENCES (Economics and Econometrics)
SOCIAL SCIENCES (Business and Management Studies)
SOCIAL SCIENCES (Politics and International Studies)
UKERC Cross Cutting Characterisation
Systems Analysis related to energy R&D (Energy modelling)
Sociological economical and environmental impact of energy (Policy and regulation)
Sociological economical and environmental impact of energy (Consumer attitudes and behaviour)
Principal Investigator
Dr P Yang
University College London
Award Type
UKERC Whole Systems Networking Fund
Funding Source
UKERC
Start Date
24 June 2026
End Date
01 July 2029
Duration
36 months
Total Grant Value
£0
Industrial Sectors
Energy
Region
London
Programme
Investigators
Principal Investigator
Dr P Yang, University College London
Other Investigator
Dr W Hua, University of Birmingham
Dr F Jalil-Vega, University College London
Dr A Lyden, University of Edinburgh
Web Site
Objectives
Abstract

As Great Britain's electricity system becomes highly renewable and increasingly electrified, it will need far more flexibility to balance supply and demand across hours, days and seasons. Long-duration energy storage (LDES), technologies such as pumped hydro, flow batteries, and compressed or liquid air energy storage that can discharge for eight hours or more, is one prominent candidate. But it is not the only one: LDES competes with interconnectors, gas generation, hydrogen and demand-side flexibility. National Energy System Operator analysis suggests 2.7 to 7.7 GW of LDES could be needed by 2035, and to help projects secure finance despite uncertain revenues, the government has introduced a Cap and Floor support scheme administered by Ofgem, with the first application window closed in 2025.

Whether, where and how much LDES is actually built therefore depends less on technical potential than on market design, policy incentives, investor confidence and local acceptance. These are precisely the factors that today's electricity system models represent weakly. Most models identify cost-optimal storage capacity but say little about how investors perceive risk, stack revenues across multiple markets, or weigh storage against competing options. They also say little about communities near proposed sites, whose acceptance increasingly shapes planning outcomes as local opposition to battery developments grows.

This project opens those models up to the people they claim to represent. It works with two types of contrasting models of the GB power system: an agent-based model that simulates how heterogeneous investors bid and combine revenue streams, and an optimisation model that minimises the system cost as a central planner. Comparing the two shows where their assumptions about storage value, investment incentives and social impacts diverge from market and community reality.

Inclusion is central to the research design. Insights gathered from workshops are intended to inform the agent-based model, in which community actors may support or oppose projects and alter their effective deployment costs, and acceptance-based adjustments in the optimisation model, so that public preferences can shape modelled technology mixes. Where the findings support it, the project will also offer practical guidance for modellers on incorporating equity and diverse perspectives into model structures and assumptions.

The project is embedded in the UCL Centre for Net Zero Market Design, whose advisory board includes representatives of DESNZ, Ofgem, NESO and industry, providing a direct route into live policy debates on LDES and electricity market reform.

Key research questions

  • How is the value of long-duration energy storage understood, realised and represented in UK electricity system decision-making under highly renewable and largely electrified scenarios?
  • How do market structures and policy frameworks, including the Cap and Floor scheme, shape the perceived risks and business case for LDES investment, and how do these perceptions compare with the assumptions used in electricity system models?
  • Which local, social and distributional impacts of LDES are underrepresented in electricity system models, and how can they be reflected more explicitly in modelling and decision-making?
  • Workshops

    In the later phase of the research, we are convening two participatory workshops in London, expected in May/June:

  • A market-focused workshop bringing together storage developers, investors and system operators to review how the two models represent investment risk, revenues and bidding behaviour, and to compare model assumptions with real market practice.
  • A community-focused workshop bringing together residents, councillors, small businesses and local groups from areas near proposed LDES sites, to discuss how storage projects affect local communities and how those impacts should be reflected in the models used to plan the energy transition.
  • No modelling background is needed for either workshop. If you are keen to participate, please contact Dr Pu Yang with a short note on your role or your connection to a proposed storage site.