go to top scroll for more

Projects

Projects: Custom Search
Reference Number UKRI779
Title Networked Energy Hubs for Accelerating Decarbonization of Transport and Energy Sectors
Status Started
Energy Categories Energy Efficiency (Transport) 50%;
Other Power and Storage Technologies (Electricity transmission and distribution) 50%;
Research Types Basic and strategic applied research 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator kang Li
University of Leeds
Award Type Standard
Funding Source EPSRC
Start Date 01 September 2025
End Date 01 September 2027
Duration 24 months
Total Grant Value £661,778
Industrial Sectors Unknown
Region Yorkshire & Humberside
Programme Energy and Decarbonisation
 
Investigators Principal Investigator kang Li , University of Leeds
  Other Investigator Amir Abiri Jahromi , University of Leeds
Sadegh Azizi , University of Leeds
Maryam Hafeez , Not supplied
Robert Kelsall , University of Leeds
Li Zhang , University of Leeds
Web Site
Objectives
Abstract Context The UK Government’s net zero strategy predicts a 60% increase in electricity demand due to the switching of energy supply modes from fossil fuel to electricity in major sectors including transport. Transport is currently the largest emitting sector, accounting for 29.1% in 2023 and decarbonizing all forms of transport is a national key priority. Railway is a cleaner transport mode, and the UK’s largest electricity consumer (~4 TWh p.a. ~1.2% of UK total). The railway's decarbonisation ambitions to phase out diesel trains by 2040 will result in a major increase in electricity demand (~ 2TWh), requiring up to £30 billion investment to electrify/decarbonize ~15,000 single track kilometre (stk) rail. The challenge the project addresses Transport electrification requires extensive updates of both the power and transport networks, which are extremely expensive and time-consuming to deploy, e.g. rail electrification costs £1~2.5m per stk, while the current lead times for critical new carbon projects to connect to the power grid are now over 15 years, and investment in transmission capacity is falling behind deployment, leading to >£1Bn cost of managing constraints. For example, in 2021, it was reported that 7TWh electricity including 2.3 TWh wind power was curtailed at a costing £1.5billion. Aims and objectives To address the dual challenges of electricity curtailment due to congestion and increased electricity demand from transport electrification in a whole system approach, this project aims to exploit the commercial application of the Networked Energy Hubs concept integrating technologies developed by Project lead in previous EPSRC projects (EP/L001063/1, EP/R030243/1 and EP/P004636/1), transforming the inflexible transport energy demands into flexible loads, absorbing excessive electricity during the night which otherwise will be curtailed to power trains and potentially road haulage in the daytime. The energy hubs are modular microgrid solutions that integrate battery storage and local renewable generation, interfacing with both the power grid and traction power supply network for trains. When they are networked and controlled via a communication network, they form virtual power plants to provide aggregated flexibility and ancillary services to the power grid, including wind power curtailment reduction, demand flexibility service, and frequency and voltage services. The project has 6 coherent work-packages to achieve the following objectives: Develop a stakeholder network and engage with key stakeholders to scope commercial applications of the networked energy hub technology (WP1). Identify use cases for railway and road electrification and decarbonization (WP2). Conduct desktop feasibility study including data analysis and initial design (WP3). Conduct simulation studies and hardware-in-loop experimentalvalidation (WP4). Assess the technological transferability, including off-shelf solutions, communication infrastructure, and cyber security issues (WP5). Conduct coast benefit analysis and project dissemination (WP6). Potential applications and benefits The project will first explore applications to the GB railway network in decarbonizing ~15,000 stk non-electrified routes, avoid constructing overhead line for at least 3,000 stk track in rural areas which can instead be served by battery trains that are powered by ~500 networked energy hubs, saving > £3billion CAPEX.  The aggregated battery storage in these networked hubs would be c. 2GWh, which can be used to absorb excessive electricity at night and power trains by day, reducing curtailment costs by c. £16m per year. The same technology can also be scaled and applied to TfL underground, electric roads, and EV charging stations in cities and along the strategic road network
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database 07/01/26