Impact of HVDC Cable Operation on Telecommunication Lines

Reference Number
NIA_NGET0089
Title
Impact of HVDC Cable Operation on Telecommunication Lines
Status
Completed
Energy Categories
Other Power and Storage Technologies(Electricity transmission and distribution)
Other Cross-Cutting Technologies or Research(Environmental, social and economic impacts)
Research Types
Applied Research and Development
Science and Technology Fields
ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
National Grid Electricity Transmission
Award Type
Network Innovation Allowance
Funding Source
Ofgem
Start Date
01 April 2014
End Date
01 May 2015
Duration
13 months
Total Grant Value
£35,000
Industrial Sectors
Power
Region
London
Programme
Network Innovation Allowance
Investigators
Principal Investigator
Project Contact, National Grid Electricity Transmission
Web Site
Objectives
The objective of this project is determine the exact nature of the problem for both LCC and VSC interconnectors, and the mitigation measures required. Review of specifications related to cable interference issues. Determination of the exact problem as related to LCC and VSC systems in their most common topography. Development of the parameters that need to be collected to completely investigate the problem. Discuss and review mitigation measures and the options available pre, during and post-construction. Development of a mechanism/process suitable for route selection. Discuss mathematical and computer modelling techniques and how these can be utilised & developed. Review measurement techniques and equipment suitable for measuring harmonic currents and induced current.
Abstract
HVDC cables installed adjacent to telecommunication lines and other assets can sometimes induce voltages which affect the functionality of these assets. The problem manifests in the telecoms line as a high noise level, making effective communication impossible. The problem National Grid faces, is that HVDC transmission links are crucial to the operation of the future, low carbon, transmission network, and interactions with other utility assets should be taken into consideration when installing, or solutions for mitigation should be found. Research The method proposed for this work is a desk based study involving a review of current standards related to cable interference issues, development of parameters needed to be collected for the problem to be investigated completely, discuss and review mitigation measures available pre, during and post construction and mathematical & computer modelling of the situations.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above