Reference Number
NIA_NGGD0036
Title
Tier One Replacement System Stage 4. 1
Energy Categories
Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas)
Research Types
Applied Research and Development
Science and Technology Fields
SOCIAL SCIENCES (Business and Management Studies)
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering)
UKERC Cross Cutting Characterisation
Not Cross-cutting
Principal Investigator
Project Contact
Cadent Gas
Award Type
Network Innovation Allowance
End Date
01 December 2014
Total Grant Value
£756,000
Industrial Sectors
Energy
Programme
Network Innovation Allowance
Investigators
Principal Investigator
Objectives
To produce initial designs for a commercialised system by utilizing the output and learning from previous related projects and stages. Compelling case to continue to Stage 4. 2
Abstract
Current methods of replacing Tier One gas distribution mains are costly, disruptive to customers and road users. This TORS initiative seeks to determine a method of achieving the outputs of mains and service replacement with increased customer satisfaction and whilst being quicker and cheaper than current methods. The renewal of mains and services within a street could be possible via one at each end of the street; this would result in reduced cost and effort, improved safety, environmental benefits through reduced waste to landfill and reduced customer and third party disruption, leading to improved customer satisfaction. This project will build on previous stages that have already delivered a feasibility investigation into the practicalities and benefits of a solution.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above
Added to Database
17/12/18