Projects: Projects for Investigator |
||
Reference Number | NIA_NGGD0057 | |
Title | ServiBoost | |
Status | Completed | |
Energy Categories | Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas) 100%; | |
Research Types | Applied Research and Development 100% | |
Science and Technology Fields | ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 100% | |
UKERC Cross Cutting Characterisation | Not Cross-cutting 100% | |
Principal Investigator |
Project Contact No email address given Cadent Gas |
|
Award Type | Network Innovation Allowance | |
Funding Source | Ofgem | |
Start Date | 01 October 2015 | |
End Date | 01 January 2017 | |
Duration | 15 months | |
Total Grant Value | £401,098 | |
Industrial Sectors | Energy | |
Region | London | |
Programme | Network Innovation Allowance | |
Investigators | Principal Investigator | Project Contact , Cadent Gas (99.999%) |
Other Investigator | Project Contact , Synthotech Limited (0.001%) |
|
Web Site | http://www.smarternetworks.org/project/NIA_NGGD0057 |
|
Objectives | The aim is to undertake a proof of concept design of a Servi-Boost device for its intended use in domestic services with a flow no greater than 6scm/h. Success of this project will be the report detailing the outcome proof of concept with the inclusion of recommendations in relation to next of next steps. | |
Abstract | National Grid has a license obligation to maintain pressures to the ECV of a property. Design minimum pressure for low pressure systems shall be no lower than: -19mbar for systems designed pre January 1996-20. 75 mbar for systems designed post December 1995Low gas pressures are evident when the gas supply to a customer’s property fails to meet the minimum pressure required to keep their appliances functioning correctly. There are numerous causes for low pressure including: undersized service pipe, low mains pressures in the area whilst work is being undertaken, new connections or greater demand by a property taking more gas than was originally designed for. The impact of low pressures results in a customer’s gas supply being interrupted until a resolution has been identified and resolved. It is important to minimise the length of an interruption to our customers by identifying a solution that can be installed promptly with minimal disruption, as any lengthy resolutions may result in complaints in some instances and create bad publicity for the business. The objective is to develop an alternative innovative solution in addressing low gas pressures in domestic service pipes, focussing on shorter interruption periods for our customers without the need to alter the network design infrastructure or elevating gas operating pressures.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above | |
Data | No related datasets |
|
Projects | No related projects |
|
Publications | No related publications |
|
Added to Database | 14/12/18 |