Reference Number ETI-CC2014
Title Thermal Power Station with CCS scoping
Status Completed
Energy Categories FOSSIL FUELS: OIL, GAS and COAL(CO2 Capture and Storage, CO2 capture/separation) 25%;
FOSSIL FUELS: OIL, GAS and COAL(Oil and Gas, Oil and gas combustion) 50%;
OTHER POWER and STORAGE TECHNOLOGIES(Electric power conversion) 25%;
Research Types Applied Research and Development 100%
Science and Technology Fields SOCIAL SCIENCES (Economics and Econometrics) 25%;
ENGINEERING AND TECHNOLOGY (Civil Engineering) 25%;
ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 25%;
ENVIRONMENTAL SCIENCES (Earth Systems and Environmental Sciences) 25%;
UKERC Cross Cutting Characterisation Not Cross-cutting 50%;
Systems Analysis related to energy R&D (Other Systems Analysis) 50%;
Principal Investigator Project Contact
No email address given
ETI (Energy Technologies Institute)
Award Type Institute Project
Funding Source ETI
Start Date 14 July 2014
End Date 31 March 2015
Duration 9 months
Total Grant Value £100,000
Industrial Sectors
Region East Midlands
Programme Carbon Capture and Storage
Investigators Principal Investigator Project Contact , ETI (Energy Technologies Institute) (99.999%)
Other Investigator Project Contact , Amec Foster Wheeler UK (0.001%)
Web Site
Objectives
Abstract The aim of this project was to scope out a potential ETI Project which would establish an investment proposal for a new, GW scale, carbon-abated, thermal power station, which minimised risk and built on infrastructure which was at the time being proposed in response to the DECC CCS Commercialisation Competition. This scoping exercise had two major components: a review of potential sites where such a station might be built, taking into account existing infrastructure and planned CO2 transport and storage infrastructure; and the development of an investment model to identify the key features of an investable CCS power project. The ETI’s ultimate objective was to establish a new investment consortium ready to undertake ‘front-end engineering design’ (FEED) on a major thermal power station development incorporating CCS (£2bn+ capex). This initial scoping project sought to create a clear view of the structure of that future FEED study, the likely shape of the power project and to identify potential partners
Publications (none)
Final Report (none)
Added to Database 11/10/18
Resource links powered by EKX™
Data>
Biomass Sustainability Dataset 2018-19
This data set details the performance of generating stations using biomass fuels on the Renewables Obligation scheme, against the scheme sustainability criteria.31/03/20
DataShine Wins the BCS Avenza Award for Electronic Mapping
DataShine Census has won the British Cartography Society’s Avenza Award for Electronic Mapping, for 2015. The glass trophy and certificate were presented to DataShine creator Oliver O’Brien at the award ceremony and gala dinner for the combined BCS/Society of Cartographers conference “Mapping Together” which took place in York, earlier this September. The prize was presented … Continue reading DataShine Wins the BCS Avenza Award for Electronic Mapping23/09/15
The Great British Bike to Work
Here’s a little visualisation created with the DataShine platform. It’s the DataShine Commute map, adapted to show online cycle flows, but all of them at once – so you don’t need to click on a location to see the flow lines. I’ve also added colour to show direction. Flows in both directions will “cancel out” … Continue reading The Great British Bike to Work20/05/16
Code modification/modification proposals with Ofgem for decision- indicative timetable
Indicative decision dates for code modification proposals with Ofgem for decision. This table is updated periodically.11/03/20
Consumer Perceptions of the Energy Market Q3 2019
This is Q3 2019 update of results from our survey monitoring domestic consumers’ perceptions of service in the energy market.02/12/19
Documents>
REA: BIOENERGY IS THE “LITTLE-KNOWN LEADER” IN BRITISH RENEWABLES - REA
\r\n\t• Bioenergy revealed as largest source of UK renewable energy;\r\n\t• Bio-power provides 11% of UK’s electricity, equivalent to four Sizewell B Nuclear power stations.\r\n\t• Biofuels ‘equivalent to taking 1...
26/03/19
Energy Systems Catapult Report ‘Innovating to Net Zero’ - DebbieHeywood
A new report by Energy Systems Catapult has found Net Zero by 2050 is possible if the UK supports innovation and scale-up across three essential areas – Low Carbon Technology, Land Use and Lifestyle.The post Energy Systems Catapult Report ‘Innovating to Net Zero’ appeared first on BIEE.
09/04/20
Labour outlines fast track to zero carbon energy by 2030 - Elaine Knutt
\n \n \tThe 30 by 2030 report - which refers to its 30 \
24/10/19
Moving hydrogen from hype to hope - William Todts
\n \n “I see a pivotal role for hydrogen,” in Europe’s efforts to achieve its climate goals, said Frans Timmermans. And up jumped the crowd in a rare standing ovation for a climate commissioner. Hydrogen is the talk of the town and the Commission is widely expected to make it a big priority in its green industrial strategy. So, are we about to enter the golden age for hydrogen and - if so - what does it mean for transport? \n\n \n\n\n \n \n \n\nRelated Environmental IssueClimate Change and EnergyRelated Transport ModeAviationCarsFreightFuelsInfrastructureLorriesShippingRelated Policy AreaInvestmentStandards
05/02/20
PRESS RELEASE: Government deployment stats fail to accurately capture >50kW PV systems - Jack Dobson-Smith
The STA continues to call on the Government to address serious flaws in the accuracy of its photovoltaic deployment data following the publication of its latest statistics, which state that solar deployment in 2019 was down by over 60MW compared to 2018, suggesting the slowest year for the industry since 2010. [1] However, the statistics fail to accurately capture PV systems sized above 50kW, with no update to the ‘50 kW to ≤ 5 MW’ category since March 2019, and only one large-scale site added to ‘> 25 MW’ category in 2019, a 34.7MWp array completed in December by GRIDSERVE. ... \nRead More\nThe post PRESS RELEASE: Government deployment stats fail to accurately capture >50kW PV systems appeared first on Solar Trade Association.
30/01/20
Return to top