Abstract:
The objective of the Distributed Energy (DE) Programme is to increase the uptake of DE through the development of integrated systems in order to reduce through-life costs, improve ease of installation and increase efficiency in the combined generation of heat and electricity. Within this programme framework the objective of the Macro DE FRP will develop and validate a software methodology to enable the design of optimised DE solutions where clusters of demand sites are linked with appropriate DE supply equipment. The project will quantify the opportunity for Macro level DE (up to 50MW) in the UK and the potential to accelerate the development of appropriate technology by 2020 for the purposes of significant implementation by 2030.
The objective of this task was to characterise the required 100kWe – 50MWe distributed energy equipment to form a library of DE supply equipment models and to project, by consultation, the technical improvement of these technologies in 2020 and 2030. This has been accomplished and the technology characteristics documented in an extensive spreadsheet.
The projected technical improvements (2020 – 2030) were obtained from consultations with manufacturers and experts in the industry. For the mature technology like gas engine, the projected technical advancement is the future technical standard which is set by the main players in the field. For less developed technologies like fuel cells, the projected technical advancement is the technical judgment from the manufacturers who were contacted.
Publication Year:
2013
Publisher:
ETI
Author(s):
ETI
Energy Category
Language:
English
File Type:
application/pdf
File Size:
133096 B
Rights:
Energy Technologies Institute Open Licence for Materials
Rights Overview:
The Energy Technologies Institute is making this document available to use under the Energy Technologies Institute Open Licence for Materials. Please refer to the Energy Technologies Institute website for the terms and conditions of this licence. The Information is licensed "as is" and the Energy Technologies Institute excludes all representations, warranties, obligations and liabilities in relation to the Information to the maximum extent permitted by law. The Energy Technologies Institute is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. This exclusion of liability includes, but is not limited to, any direct, indirect, special, incidental, consequential, punitive, or exemplary damages in each case such as loss of revenue, data, anticipated profits, and lost business. The Energy Technologies Institute does not guarantee the continued supply of the Information. Notwithstanding any statement to the contrary contained on the face of this document, the Energy Technologies Institute confirms that it has the right to publish this document.
Further information:
N/A
Region:
United Kingdom
Related Dataset(s):
No related datasets
Related Project(s):
Related Publications(s):
Macro DE - An Assessment of the GB Benefits Associated with Potential DE Technology Development
Macro DE - Application of Energy Centre Design Tool to Characteristic Zones
Macro DE - Description of design methodology and tool effectiveness
Macro DE - Design Practice Characterisation Report
Macro DE - Development of a methodology to calculate energy demand
Macro DE - District Heating Network (DHN) Design and Algorithm Verification
Macro DE - Energy Demand Analysis in Great Britain
Macro DE - Executive Summary - DE2002 / WP2.3: Energy Demand Analysis in GB
Macro DE - Executive Summary - DE2002 / WP5.1: GB Benefits Case for Macro DE
Macro DE - GB Benefits Case for Macro Distributed Energy
Macro DE - Macro DE Technology Assessment Criteria
Macro DE - Macro DE WP5.4 : Summary Report