go to top scroll for more

Alternative Jointing Techniques for Small Diameter PE Pipe: Final Report

This resource links to a document we hold in our system

Abstract:

<p>This document is a closedown report for the project titled 'Alternative Jointing Techniques for Small Diameter PE Pipe'.</p> The primary objectives of this stage are to: <ol> <li>Conduct a gap analysis to compare the requirements of Standards that selected fittings conform to, with the requirements of established UK Gas Industry Standards.</li> <li>Demonstrate, under laboratory conditions, the assembly of all mains-to-meter mechanical fittings from 4 different manufacturers and compare against a conventional electrofusion mains-to-meter assembly.</li> <li>Undertake laboratory tests of selected fittings for both leak tightness and pull-out resistance.</li> <li>Undertake a cost benefit analysis and undertake field observations. </li> </ol> </br> This report covers the project's: <bl> <li>Scope</li> <li>Objectives</li> <li>Success Criteria</li> <li>Performance Compared to the Original Project Aims, Objectives and Success Criteria</li> <li>Required Modifications to the Planned Approach During its Course</li> <li>Lessons Learnt for Future Projects</li> <li>Outcomes</li> <li>Planned Implementation</li> </bl>

Publication Year:

2014

Publisher:

Ofgem

DOI:

No DOI minted

Author(s):

National Grid Gas Distribution

Energy Category

Language:

English

File Type:

application/pdf

File Size:

51037 B

Rights:

Rights not recorded

Rights Overview:

Rights are not recorded within the edc, check the data source for details

Further information:

N/A

Region:

United Kingdom

Publication Type:

Project Report

Theme(s):

Placeholder Theme

Related Dataset(s):

No related datasets

Related Publications(s):

No related publications