EDC Serial Number
|
EDC0000144 |
Title
|
New Thames Valley Vision - Ice Bear |
Data Location
|
https://data.ukedc.rl.ac.uk/browse/edc/Electricity/NTVV/Ice_Bear
EDC Stored Dataset
|
Description
|
Data from a trial of an Ice Bear cold thermal energy storage unit in one building during the New Thames Valley Vision (NTVV) project. |
DOI
|
(none given) |
Sector
|
Commercial |
Coverage
|
England Bracknell Start: 01/09/2015 End: 21/04/2016
|
Usage Rights for this Data
|
Open Access This data may be freely used for any purpose
|
Data Type
|
Time Series |
Parameter Names
|
Air temperature, power consumption. |
Units
|
1 x Buildings |
Number of Records
|
1 |
IEA Category
|
Electricity transmission and distribution
|
Creator of the Data
|
SSEN |
Data made available by
|
SSEN |
Format
|
text/csv |
Language
|
English |
Project
|
New Thames Valley Vision The New Thames Valley Vision (NTVV) project monitored the electricity network in Bracknell and tested new technologies to control how and when electricity is used. |
Related Datasets
|
See all related datasets
|
Other Information
|
This data records the trial of one Ice Bear unit in the New Thames Valley Vision (NTVV) project. The Ice Bear unit provides a block of ice, which is installed as part of an air conditioning system. During the day, the air conditioning unit will blow air through the ice, creating cool air. During the night, the Ice Bear will freeze the ice again, ready for use the next day, so deferring energy usage from the day time, to the night time.
The data format is described in Ice_Bear_readme.txt.
Background information on the NTVV project and the Ice Bear unit can be found in report SDRC_9.8a_4_Cold_Thermal_LV_Network_Energy_Storage.pdf and at www.thamesvalleyvision.co.uk.
Use of these data is subject to terms and conditions. |