go to top scroll for more

EPSRC Manifest Battery Energy Storage System (BESS) The University of Manchester

The archiving service is currently experiencing issues, please bear with us whilst we investigate the problem. Check service status here

This resource links to a data we hold in our archive

Description:

The data is from tests performed at The University of Manchester on a commercial 240 kW 180 kWh lithium-ion battery electrical energy storage system (BESS) within the EPSRC funded Multi-scale ANalysis for Facilities for Energy STorage (Manifest) Project (EP/N032888/1). The system is connected to the LV network (400 V) and is located on campus within a mixed-use (offices, lecture theatres, and laboratories) university building (so behind the meter). The tests carried out in March 2017 are described in the PDF Experiment_Description_Readme.pdf

Creator:

Alessandro Massi Pavan The University of Manchester

Publisher:

Alessandro Massi Pavan The University of Manchester

DOI:

No DOI minted

Citation (APA Style 7th Edition):

Alessandro Massi Pavan The University of Manchester (2017). EPSRC Manifest Battery Energy Storage System (BESS) The University of Manchester [Data set]. Alessandro Massi Pavan The University of Manchester. https://ukerc.rl.ac.uk/cgi-bin/dataDiscover.pl?Action=detail&dataid=4bd6e2eb-1417-4c8c-a9f0-6587fae2c0c5

Energy Category

Class Name:

Subclass Name:

Category Name:

Field Dates:

01/03/2017 - 01/03/2017

Data Date Range:

01/03/2017 - 01/03/2017

Data type:

Time Series

Data format:

text/csv

Language:

English

Number of Units:

1

Unit Type:

Battery Test Facility

Number of Records:

2658

Parameters:

Date and UTC time, Frequency of the grid (Hz), Real power exchanged with the grid P (kW), Reactive power exchanged with the grid Q (kVAr), State of Charge SoC (%), DC voltage (V), DC current (A), average AC voltage (V), the average AC current (A), battery ambient temperature (Degrees C)