Biomass to Power with CCS - WP2 High-level Engineering Study: Report on Selected Technology Combinations


Citation The TESBiC consortium Biomass to Power with CCS - WP2 High-level Engineering Study: Report on Selected Technology Combinations, ETI, 2012. https://doi.org/10.5286/UKERC.EDC.000022.
Cite this using DataCite
Author(s) The TESBiC consortium
Project partner(s) CMCL Innovations, The University of Cambridge, Doosan, Drax, EDF, E4Tech, Imperial College London, The University of Leeds
Publisher ETI
DOI https://doi.org/10.5286/UKERC.EDC.000022
Download BIO_BI2001_7.pdf
Associated Project(s) ETI-BI2001: Techno-Economic Study of Biomass to Power with CCS (TESBIC)
Associated Dataset(s) No associated datasets
Abstract TESBiC: Techno-Economic Study of Biomass to power with CCS. This report, the 2nd deliverable from the project, is a high level study of the engineering associated with implementing each of the 8 technologies identified in the Technology Landscape report (1st deliverable: WP1). It includes, for each technology, an overview evaluation of system performance. It provides a critical assessment of knowledge gaps, technical risks and subject areas that will require further development work. It also includes an overview of the total process for the combined technologies, preliminary process flow diagrams, high level process control philosophy, environmental performance summary, estimate of the project development and capital costs and an estimate of operating and maintenance costs